What a reinstatement cost assessment covers
RICS sets out how surveyors assess the cost of reinstating a building: rebuilding it to its existing form, using appropriate materials and methods, with allowances for demolition, debris removal, professional fees and statutory requirements. The result informs the sum insured.
For homes, BCIS provides a public rebuilding cost calculator and is clear that it is guidance, not a replacement for professional advice on complex or unusual buildings.
Before a loss and after a loss
A reinstatement cost assessment is usually carried out before any claim, to set adequate cover. After a disaster, the work shifts to assessing actual damage and the cost of repair or rebuilding. Both rely on knowing the building: its footprint, height, construction, materials and features.
Evidence that supports the surveyor
A well-documented building record shortens site time and strengthens the assessment.
- Photographs of every elevation and the roof
- Corrected elevations showing openings, storeys and features
- Location and setting, including access constraints
- Specialist notes on construction type, materials and approximate age
- Listed status, conservation area or heritage features
Portfolios and estates
Local authorities, housing providers and commercial landlords manage many buildings. Keeping a consistent digital record for each one, updated over time, gives surveyors a reliable starting point at every revaluation cycle and after any event.
Instructing a reinstatement cost assessment
A clear instruction saves time for both client and surveyor. Share the building record in advance, confirm whether outbuildings, boundary walls and external works are included, and state any heritage or planning constraints. The surveyor then confirms measurements on site and applies current rebuilding rates to produce the assessment.
- Purpose of the assessment and the policy it informs
- Buildings and external works in scope
- Known alterations, extensions and specification upgrades
- Access arrangements and site constraints
What your team gains
- 01Better-prepared surveyor instructions and site visits
- 02Consistent building information across a portfolio
- 03A clear distinction between sum insured and damage repair