Evidence when access is limited
Where streets are unsafe or restricted, satellite context and drone footage establish the extent of damage. Building records created from that evidence give engineers a starting point before they can reach every site.
Construction, age and materials matter most
Earthquake and blast damage depend heavily on how a building was made. Specialists record:
- Structural system: masonry, reinforced concrete frame, timber, mixed
- Building age and design era
- Partial collapse, cracking, shear and deformation patterns
- Fire damage following the event
- Heritage value and features to retain
Planning reconstruction
Reconstruction programmes run for years. A twin that links evidence, review, architectural drawings and cost plans keeps every decision traceable, supports heritage-led rebuilding and gives funders a transparent view of progress.
Rebuilding with memory
Historic districts carry identity as well as housing. Photographs, elevations and 3D geometry preserve the appearance of facades, openings and details, giving architects and heritage specialists the information they need to repair, reinstate or reinterpret what was lost. Records made early become an irreplaceable reference later.
Where archives, older photographs or drawings survive, they can sit alongside new evidence in the same record, giving designers a fuller view of how each building looked and was built before the damage.
Organising a multi-year programme
Long reconstruction programmes change teams, funders and priorities. A durable building record keeps evidence, specialist review, drawings and cost plans together across those changes. Each phase can be reported clearly, and new teams can pick up where others finished without collecting the evidence again.
- Phase work by district and building priority
- Keep review findings with the evidence they describe
- Link drawings and cost plans to each building record
- Add completion evidence as buildings are restored
What your team gains
- 01A record of districts that teams cannot yet reach
- 02Construction-aware reconstruction planning
- 03Long-term traceability for funders