Build a record of destruction, building by building
A conflict-affected district can contain destroyed homes, partially collapsed buildings and standing structures with damage that needs closer investigation. Begin with an urban overview, then organise the available evidence around individual buildings and their surroundings.
Satellite and oblique imagery provide context, while drone and ground photographs reveal different views of roofs, façades and visible construction. Reviewing building identities keeps repeated observations connected to the same structure rather than counting each view as a separate building.
- Locate affected buildings within the wider neighbourhood.
- Organise aerial and ground-level evidence under a consistent building identity.
- Preserve the original images and the context of each observation.
Document the visible condition and the evidence behind it
Record missing roofs, collapsed floors, damaged façades, fire-affected areas and exposed construction in their original context. Keep the source, date and available location information alongside the observations so technical reviewers can understand how the record was assembled.
Separate the event description from the visible findings. An image documents a condition; attributing responsibility or identifying a particular weapon requires its own investigation. Consistent building evidence gives reconstruction professionals a clear basis for their work without mixing those distinct purposes.
Plan access with the responsible authorities and qualified clearance teams where unexploded ordnance or other hazards may be present. Handle sensitive coordinates and identifying information according to the project’s security and safeguarding requirements.
Connect the damaged building to its reconstruction model
BuildingsLife.ai brings building interpretation, elevations and 3D representations into the evidence workflow. Professionals can review volumes, storeys, roofs and architectural elements while returning to the photographs behind the interpretation.
Keep the observed damaged condition distinct from a proposed or reconstructed pre-disaster form. Earlier photographs, drawings and other records help explain missing geometry and support decisions about conservation, repair and rebuilding. Preserve both the current condition and the basis of the proposed reconstruction.
Develop a neighbourhood reconstruction programme
A reconstruction programme must connect individual building assessments to community needs. Homes, schools, health facilities and other essential services may have different priorities, access requirements and dependencies. Use consistent records to develop the questions that the responsible professionals and authorities must resolve.
Define the scope of repair or reconstruction before developing quantities and cost assumptions. Relate each proposal to the evidence, local construction conditions and professional assessment, giving funders and project teams a documented basis for comparing recovery options.
- Identify additional surveys and specialist reviews required for each building.
- Develop repair and reconstruction scopes with the responsible professionals.
- Relate cost assumptions to the proposed interventions.
- Organise buildings into a consistent street or district recovery programme.
Preserve continuity from first survey to rebuilding
Recovery changes the appearance of a site. Debris is removed, temporary works are installed and buildings are repaired or replaced. A consistent building identity helps teams relate new observations and revised proposals to the original condition.
Start with a representative group of buildings, establish the evidence and review process, and apply the same structure across the reconstruction programme. This gives local authorities, engineers, surveyors and recovery partners a common basis for discussing the next intervention.
What your team gains
- 01Building-level documentation of war destruction
- 02Original evidence connected to drawings and reconstruction models
- 03A documented basis for repair scopes and reconstruction cost planning
- 04Consistent records for neighbourhood and city recovery programmes